An insulation specialist and site manager discuss a new-build project in the Netherlands

A robust building envelope from the very first detail

New-build insulation

Good insulation for new builds starts before installation. Greenisolatie helps you plan materials, junction details and scheduling, ensuring the insulation envelope is installed without unnecessary interruptions.

  • Coordination with the contractor and site manager
  • Attention to junction details
  • Work scheduled for each construction phase

Discuss your new-build project

Get tailored advice on the building envelope, material selection, planning and installation.

Choose services:
  • 25.000+ homes insulated
  • Your subsidy handled from start to finish
  • 10 years warranty

  • We handle the subsidy

  • Expert installation

  • Rated 5 stars

From your current situation to a clear plan

Insulation as part of the construction process

In new builds, the result depends on more than just the material's insulation value. Junctions around window frames, roofs, floors and building services need particular attention at an early stage.

We align our work with the drawings, sequence of works and construction schedule. This ensures that coordination points are discussed in good time and that the work remains clear and manageable for everyone involved.

Discuss your project with no obligation

Tailored solutions

From construction details to a fully insulated building envelope

We assess each part of the building and ensure that materials and junctions work together properly.

01

Roof and external walls

A continuous layer of insulation with careful attention to corners, service penetrations and junctions.

  • Installation with attention to detail
  • Material suited to the structure
  • A clear sequence of work
02

Floor and foundations

Coordinating work on ground floors and their edges helps minimise unnecessary thermal bridges.

  • Early coordination
  • Junction with the external wall
  • Verifiable installation quality
03

Glazing and window frames

Glazing and window frames are selected to suit the architectural details, appearance and required performance.

  • HR++ or triple glazing
  • Airtight joint
  • Made to measure for each opening in the external wall

Professionally managed from preparation to completion

  • Clarity from the outset

    Potential issues are discussed before they delay the work.

  • Less repair work

    Good coordination reduces the need for improvisation and duplicated work on site.

  • Consistent quality

    The same principles are followed throughout the project.

  • Work that can be scheduled in advance

    Teams and deliveries are scheduled in line with the construction phases.

  • Clear handover

    The scope, details and responsibilities are agreed and documented in advance.

  • One insulation partner

    Work on several parts of the building can be coordinated as a single project.

Explore further

From a standalone measure to a coordinated project

Explore related options or speak to us directly about the right approach for your building.

How we work

  1. 1

    Project assessment

    We review the drawings, schedule and performance requirements.

  2. 2

    Agreeing the details

    Junctions and interfaces are reviewed together.

  3. 3

    Work preparation

    Materials, quantities and project phases are documented.

  4. 4

    Installation

    The insulation is carefully installed at each stage of construction.

  5. 5

    Inspection

    We check the completed work and discuss any outstanding items at handover.

25.000+ people have already chosen us!